emonsteremonster tools

Battery runtime

Estimate ideal runtime from battery energy, usable capacity, efficiency and load. Change the inputs to update the chart or diagram.

Your inputs

The editable example is illustrative. Enter your own dimensions, operating data, prices, and fees. Results update as you edit.

Capacity input unit
0–1
0–1
≥ 0.000000000001 W

Calculations run in your browser. Inputs are not saved or sent to analytics.

How it works

  • Usable delivered energy = × × ; Estimated runtime = Usable delivered energy (Wh) ÷ (W); = ×
  • Worked example: 500 Wh × 0.8 × 0.9 = 360 Wh; 360 Wh /100 W = 3.6 h
  • Supported input limits: : 0 ≤ x ≤ 1,000,000,000,000; : 1e-12 ≤ x ≤ 1,000,000,000,000; : 0 ≤ x ≤ 1,000,000,000,000; : 0 ≤ x ≤ 1; : 0 ≤ x ≤ 1; : 1e-12 ≤ x ≤ 1,000,000,000,000
Input and formula key

Your result

Complete the inputs to see your result.

Assumptions and limitations

Ah requires the battery’s voltage to estimate Wh. Usable fraction and efficiency separately reduce delivered energy before division by a constant load. Aging, temperature, discharge-rate effects and inverter standby consumption are not automatically modeled.

Sources

Explore this subject: Energy and water

Your privacy & preferences

Optional analytics helps us understand how emonster.tools is used. The site works normally without it. Your analytics choice is stored on this device so you can change it later; choosing not to allow analytics prevents optional measurement and removes Google Analytics cookies this site can access. Read Privacy Policy